Projects

Philip Furnari Philip Furnari

MHF Foam Suppression System Upgrade

One of our valued customers is operating a Major Hazard Facility (MHF), where the tank fire protection system required an upgrade by replacing the existing foam proportioning units with new state of the art direct-motor driven pump proportioning systems all operated remotely via the Process DCS. Vecta were engaged to engineer, manage and deliver this project.

Read More
Robert Lenders Robert Lenders

Coal Seam Gas Central Processing Plant FEED Study

Vecta conducted a FEED study for a new coal seam gas 80 TJ/d central processing plant in the Surat Basin Queensland. Part of this FEED study would comprise a 10% cost estimate for the detailed design, procurement, construction and commissioning phases of project delivery.

Read More
Robert Lenders Robert Lenders

E&I Engineering Support

Vecta were engaged to provide Electrical, Instrumentation and Controls (EI&C) engineering support during the critical phases of the gas plant upgrade, which were the mechanical completion, pre-commissioning and commissioning phases.

Read More
Robert Lenders Robert Lenders

FEED Study (Manufacturing Facility)

In 2020, the Client engaged Vecta to conduct a FEED study for a new manufacturing facility in Victoria. Part of this FEED study would comprise a 10% cost estimate for the detailed design, procurement, construction and commissioning phases of project delivery.

Read More
Robert Lenders Robert Lenders

Hydrocarbon Spill Remediation System

Our client is a prominent supplier of liquid fuels to the Australian domestic market. As part of their ongoing operations they required the installation of a remediation system to extract LNAPL from the ground water. This system is comprised of underground pumps and hoses and a collection tank including a truck load out bay. Vecta was engaged to provide a turn-key solution from a consultant-supplier concept design through to commissioning.

Read More
Philip Furnari Philip Furnari

Gas Plant Upgrade

Our client is Australia’s biggest gas pipeline operator. Upon acquisition of an existing gas processing plant in the Gippsland region, our Client sought to invest in processing capacity to increase the plant throughput. Our scope included the supply, fabrication, installation and testing activities necessary to complete Project Structural, Mechanical, Piping, Electrical and Instrumentation (SMPEI) construction works package. Vecta reached practical completion of the scope of works in July, 2022.

Read More
Philip Furnari Philip Furnari

Gas Pressure Piping

Our client is a prominent Gas explorer, producer and supplier of Gas to the Australian domestic market. As part of the acquisition of an existing gas processing plant in the South West of Victoria, our Client required significant existing pipework to be either replaced due to condition, or redirected as part of process improvement. Vecta were engaged to undertake the complete end to end delivery of these works.

Read More
Robert Lenders Robert Lenders

Flare Shroud Tank Replacement

Our client is a prominent Gas explorer, producer and supplier of Gas to the Australian domestic market. As part of the acquisition of an existing gas processing plant in the South West of Victoria, our Client required the tank that encompasses the flare to be replaced. Vecta were engaged to undertake the complete on site works, with the new flare tank being free issued.

Read More
Robert Lenders Robert Lenders

Gas Plant - Return to Service

Upon acquisition of an existing gas processing plant in the Otways region, our Client required the facility to be brought back from a mothballed state to full production. Vecta is currently undertaking the site works associated with this plant refurbishment.

Read More
Robert Lenders Robert Lenders

Online Condition Monitoring

Following a recent RAM study, Vecta were engaged by the Client to perform follow-up work on two of the RAM study recommendations, seeking budget estimates for Condition Monitoring Improvements and recommended Critical Spares for reciprocating compressors.

Read More
Robert Lenders Robert Lenders

Steam & Condensate Pipework - Fabrication & Installation

Includes the fabrication of piping spools and consequent installation activities associated with the replacement program. While most of the tie-in works will be undertaken during shutdown conditions, the pre-planning works including fabrication and access requirements (e.g. scaffolding) will be undertaken prior to the outage events.

Read More
Robert Lenders Robert Lenders

RAM Study

Vecta were engaged by the Client to perform a Reliability, Availability and Maintainability (RAM) study of compressor systems in a midstream oil and gas facility. The Client planned to use the findings and recommendations to assist in developing the most suitable scope for a major expansion project.

Read More
Robert Lenders Robert Lenders

Process Engineering Support

Vecta were engaged to provide process engineering support during the critical phases of the gas plant upgrade, which were the mechanical completion, pre-commissioning and commissioning phases.

Read More
Robert Lenders Robert Lenders

Pipeline Coating Assessment

The surface coating condition of the product pipelines required assessment to ascertain a structured and methodical repair program, systematically ensuring the protection of the integrity of the parent pipeline material.

Read More
Robert Lenders Robert Lenders

Fire Water Tank Replacement

Part of the essential services in maintaining the operational integrity of the Newport site is the fire water system. The fire water tank had reached its life cycle end, and hence required replacement. Vecta were engaged to engineer, manage and deliver this project.

Read More
Robert Lenders Robert Lenders

Diesel Additive System

As ongoing improvement in diesel fuel technology is realised, new products to the market can enhance performance. Our Client, therefore, has the requirement to enhance their diesel fuel by dosing with an additive. Vecta were engaged to deliver the additive dosing system project end-to-end.

Read More
Robert Lenders Robert Lenders

E&I Supervisor Support

Vecta were engaged to provide Electrical & Instrumentation (E&I) supervisory support during the critical phases of the gas plant upgrade, which were the mechanical completion, pre-commissioning and commissioning phases.

Read More
Robert Lenders Robert Lenders

Fire Pumps Replacement

The fire suppression system, which is an integral component of the sites’ essential services, required upgrading. Vecta were engaged to manage, procure, fabricate and site install the scope of works.

Read More
Robert Lenders Robert Lenders

Jet Fuel Pipework Optimisation

There are currently three Jet Fuel storage tanks at the terminal. The purpose of this scope of works is to provide the tanks with additional system capability to accept product from various sources, and discharge product to various locations.
Vecta Group were engaged to engineer, manage and deliver this project.

Read More
Robert Lenders Robert Lenders

Project Delivery Process Development

Vecta Group was engaged to develop a Project Delivery Process for the Client in order to harmonise the Client’s existing project engineering documentation as well as to increase their consistency, accuracy and quality.

Read More