Front End Engineering Design
Vecta have completed a number of FEED studies over the years including the following:
$30M FEED study for a new manufacturing facility in Victoria. Part of this FEED study would comprise a 10% cost estimate for the detailed design, procurement, construction and commissioning phases of project delivery. The scope of work included:
Development of drawings and documents in the Process, Mechanical, Civil, Electrical, Instrumentation & Controls disciplines;
Development of a detailed 3D model for the facility;
Scope preparation for detailed design and construction;
Project management including schedule, budget and technical queries;
+/- 10% cost estimate for detailed design, procurement, construction and commissioning. This included performing a Monte Carlo analysis to quantitatively analyse project risks.
Vecta were engaged to conduct a FEED study for a new $140M coal seam gas 80 TJ/d central processing plant in the Surat Basin Queensland. Part of this FEED study would comprise a 10% cost estimate for the detailed design, procurement, construction and commissioning phases of project delivery. The scope of work included:
Development of drawings and documents in the Process, Mechanical, Civil, Electrical, Instrumentation & Controls disciplines;
Development of detailed 2D layout plans for the plant;
Scope preparation for detailed design and construction;
Preparation of vendor packages including technical specifications and datasheets for market pricing of major equipment items;
Project management including schedule, budget and technical queries;
+/- 10% cost estimate for detailed design, procurement, construction and commissioning. This included performing a Monte Carlo analysis to quantitatively analyse project risks;
Level 1 schedule.
Active Skimming Facility ($850K) - Newport, Victoria - Scope of work included the following:
Development of documentation including review of code requirements, PIDS, layout drawings to enable a HAZOP of selected option to be completed;
Bottom up cost estimate to enable financial decision to be made.
Jet Supply De-Bottlenecking FEED:
Project Management including weekly progress reporting, document control, cost control and schedule activities;
Estimating including FEED level Capital Cost Estimate;
Process Engineering including Basis of Design, technical note and hydraulic calculations to determine existing pumps adequacy, PIDs, HAZOP reviews etc.;
Piping/Mechanical Engineering including, isometrics, tie-in lists, bulk MTOs, procurement requisition for valves, construction works;
Instrument and Controls Engineering including Functional Control specifications, , loop diagrams, termination drawings, instrument enquiry packages;
Provision of a HAZOP Facilitator including HAZOP minuter and HAZOP Scribe.