Flow Assurance
Our people have expertise primarily from the Gas Industry in Australia. Our skills are in the development of models for greenfield and brownfield installations to overcome the flow assurance challenges of liquid hold up, low gas rate and low gas pressure, water from de-watering and hydrate formation.
Our people have core competencies that include:
Steady state and transient modelling
Hydrate management studies
Scenario modelling to determine optimum design
Our team have worked on projects that have included:
Initial route selection and Pipesim steady state modelling of gas and water gathering lines including low point drains and high point vents.
Flow Assurance studies for offshore multi-phase pipelines and onshore sales gas pipeline networks.
Flow assurance for well flow-lines.
Completion of a hydrate management study for an LPG plant.
Flow assurance study for an upstream pipeline network, involving
Transient and steady state hydraulic simulations of differing operating scenarios for different pipeline routes
Determination of:
Line-pack and survival times;
Compressor discharge pressures;
LNG Facility arrival pressure;
Line sizing;
Mid-line compressor power/location;
Free-flow capacities
Flow assurance concept study for a pipeline conversion from dry to wet operation (steady-state model with PIPESYS extension and OLGAS correlation) focusing on hydrate and liquid inventory management, involving:
Correlating the model against the operating pressure profile using available data and the pipeline route information;
Modelling a range of desired sales gas rates to determine the liquid inventory profiles;
Yielding MEG injection rates at desired concentrations to achieve hydrate safety margins;
Approximating liquid hold-up to estimate pigging frequency and to use for slug catcher design options.
Water line surge, water hammer and vacuum analysis.