Instrument Air System Upgrade

Key Capabilities

  • Project Management

  • On-site Installation

  • Self-Perform – Electrical, Instrumentation and Mechanical

  • Specialist subcontractor engagement

  • Commissioning

Overview

Our Client operates the Dandenong City Gate which has an existing instrument air supply arrangement.

To guarantee future supply a new dedicated air package is required within the LNG facility

 The Proposed package will include dedicated duty stand-by air compressors with wet air receivers, desiccant driers and oily water collection tank and a large volume dry air receiver with capacity to supply the LNG facility and for Dandenong City Gate.

Scope

The scope including:

•Mechanical equipment installation

•Pipework suppl and install

•Electrical and instrumentation works

•Commissioning

Delivery

Vecta Group self performed:

  • Project management

  • Procurement

  • Construction –  structural, piping, mechanical, electrical and instrumentation

  • Commissioning

  • Civil works were subcontracted.

Vecta executed the works without incident commencing with the civil works (which included bored piers), pipework supply and fabrication, electrical and instrumentation works for the complete installation through to pre-commissioning, testing, commissioning and operating integrity.

Challenges

Significant timeframe deadlines were imposed on the project driven predominantly by market conditions.  In a collaborative approach between Vecta and our Client, the project was delivered ahead of the aggressive target without incident.

Outcomes

Vecta are proud that the project was delivered for our client successfully, on time and budget without incident.

Next
Next

Clean Fuels - Early Contractor Involvement