Forward Thinking. Solution Driven
VECTA SERVICES
Based in Melbourne, Vecta Group brings to our Customers integrated engineering design and construction solutions that spans from end to end providing innovative and cost effective outcomes.
Vecta can also integrate with your team and match your business needs at whatever stage of development of your facility; from conceptual analysis, engineering design, construction, commissioning and maintenance services.
PROJECT DELIVERY
We have reviewed the way projects are typically executed and have found a better way. Our Project Delivery Methods are based on a proven ‘gate system’ that ensures the required deliverables are ‘fit for purpose’, developed appropriate to the relevant Project phase.
MARKET SECTORS
Vecta have experience to work across most market sectors with a particular focus on Energy, Resources and Infrastructure. Our service offering includes design and construct delivery as well as asset optimisation and turnaround execution.
QUALITY & SAFETY
We have produced our own in-house Vecta Management System (VMS) to meet the rigorous quality needs of our clients and ensure our system is implemented through regular audits and 3rd party certification to ISO 9001. Our VMS system is also audited and certified to meet ISO 45001.
OUR PROJECTS
Our Client operates the Dandenong City Gate which has an existing instrument air supply arrangement.
To guarantee future supply a new dedicated air package is required within the LNG facility
The Proposed package will include dedicated duty stand-by air compressors with wet air receivers, desiccant driers and oily water collection tank and a large volume dry air receiver with capacity to supply the LNG facility and for Dandenong City Gate.
Our Client is a significant supplier of fuel, lubricants and specialty hydrocarbon products to commercial customers in the aviation, marine, transport, resources, defence, construction, agriculture and manufacturing industries.
Vecta were engaged to provide Early Contractor Involvement (ECI) which is a collaborative approach used in the construction industry where contractors are engaged in the project delivery process at an early stage, often before the design is fully completed. This approach contrasts with traditional methods where contractors are typically brought in after the design phase is complete.
The West Gate Tunnel Project (WGTP) in Melbourne is part of Victoria's’ Big Build that will upgrade the West Gate Freeway and link to CityLink at Docklands via a tunnel beneath Yarraville.
Vecta have been engaged to provide skilled and experienced personnel for the installation of 300T+ steelwork associated with the electrical, instrumentation, signalling and HVAC services of the tunnel sections of the Project.
One of our valued customers is operating a Major Hazard Facility (MHF), where the tank fire protection system required an upgrade by replacing the existing foam proportioning units with new state of the art direct-motor driven pump proportioning systems all operated remotely via the Process DCS. Vecta were engaged to engineer, manage and deliver this project.
Vecta conducted a FEED study for a new coal seam gas 80 TJ/d central processing plant in the Surat Basin Queensland. Part of this FEED study would comprise a 10% cost estimate for the detailed design, procurement, construction and commissioning phases of project delivery.
Vecta were engaged to provide Electrical, Instrumentation and Controls (EI&C) engineering support during the critical phases of the gas plant upgrade, which were the mechanical completion, pre-commissioning and commissioning phases.
In 2020, the Client engaged Vecta to conduct a FEED study for a new manufacturing facility in Victoria. Part of this FEED study would comprise a 10% cost estimate for the detailed design, procurement, construction and commissioning phases of project delivery.
Our client is a prominent supplier of liquid fuels to the Australian domestic market. As part of their ongoing operations they required the installation of a remediation system to extract LNAPL from the ground water. This system is comprised of underground pumps and hoses and a collection tank including a truck load out bay. Vecta was engaged to provide a turn-key solution from a consultant-supplier concept design through to commissioning.
Our client is Australia’s biggest gas pipeline operator. Upon acquisition of an existing gas processing plant in the Gippsland region, our Client sought to invest in processing capacity to increase the plant throughput. Our scope included the supply, fabrication, installation and testing activities necessary to complete Project Structural, Mechanical, Piping, Electrical and Instrumentation (SMPEI) construction works package. Vecta reached practical completion of the scope of works in July, 2022.
Our client is a prominent Gas explorer, producer and supplier of Gas to the Australian domestic market. As part of the acquisition of an existing gas processing plant in the South West of Victoria, our Client required significant existing pipework to be either replaced due to condition, or redirected as part of process improvement. Vecta were engaged to undertake the complete end to end delivery of these works.
Our client is a prominent Gas explorer, producer and supplier of Gas to the Australian domestic market. As part of the acquisition of an existing gas processing plant in the South West of Victoria, our Client required the tank that encompasses the flare to be replaced. Vecta were engaged to undertake the complete on site works, with the new flare tank being free issued.
Upon acquisition of an existing gas processing plant in the Otways region, our Client required the facility to be brought back from a mothballed state to full production. Vecta is currently undertaking the site works associated with this plant refurbishment.
Following a recent RAM study, Vecta were engaged by the Client to perform follow-up work on two of the RAM study recommendations, seeking budget estimates for Condition Monitoring Improvements and recommended Critical Spares for reciprocating compressors.
Includes the fabrication of piping spools and consequent installation activities associated with the replacement program. While most of the tie-in works will be undertaken during shutdown conditions, the pre-planning works including fabrication and access requirements (e.g. scaffolding) will be undertaken prior to the outage events.